Livingston Multi-Family Roof Replacement | ALR

Livingston Multi Family #2

Livingston, Calgary

|

September 2025

Calgary large-scale exterior renovation

This report outlines the successful completion of the roofing installation portion of the Livingston Multi-family buildings 1-8 The project consisted of eight (8) multi-family buildings and included a large-scale exterior renovation scope involving roofing, metal work, windows, doors, garage doors, and vinyl siding upgrades throughout the complex.

While this report is specific to the roofing installation, Advanced Level Roofing is pleased to confirm the successful completion of the full project scope across all eight buildings, completed on schedule and within the approved project budget. The roofing scope included the complete installation of a high-quality architectural roofing system designed to provide long-term weather protection, durability, and performance. Roofing work completed included:

  • Full roof underlayment installation across all roofing areas
  • Installation of ice and water shield in valleys and other critical leak-prone areas for enhanced moisture protection
  • Installation of architectural shingles using proper fastening patterns and manufacturer-approved installation methods
  • Reinforcement and proper finishing of roof valleys with correct shingle layering and waterproofing practices
  • Installation and integration of flashing systems at all roof transitions, penetrations, and critical details to ensure a complete weather-tight seal
  • Installation of ridge cap shingles with proper overlap and fastening for long-term ridge protection and ventilation performance

Throughout the project, the Advanced Level Roofing team maintained daily coordination, site supervision, safety management, and quality control to ensure efficient execution and consistent
workmanship across all buildings within the development.

Project Performance

  • Timeline: Roofing installation and full exterior project scope completed on schedule
  • Budget: Successfully completed within the contracted budget
  • Quality: Installation completed to manufacturer specifications and industry best practices
  • Inspection: Final roofing inspections completed successfully by the ALR team
  • Client Satisfaction: Project delivered professionally and to client expectations across all eight
    buildings

The successful completion of this project reflects the strong coordination, communication, and workmanship provided by the Advanced Level Roofing team. The completed roofing systems will provide long-term durability, enhanced weather protection, and reliable performance for the Livingston Multi-family complex for years to come.

Documentation

  • Detailed progress and completion photos for all buildings are attached throughout this report for reference.
  • Applicable project safety documentation and inspection records were maintained throughout the duration of the project.
Scope:

Large-scale exterior renovation scope involving roofing, metal work, windows, doors, garage doors, and vinyl siding upgrades throughout the complex.

Timeline:

Roofing installation and full exterior project scope completed on schedule